FLAT-RATE PRICING • DUMP FEE INCLUDED • SAME DAY DISPATCH • COI ON DEMAND • WEST VALLEY
COMMERCIAL RATES - BUILDER & CONTRACTOR - FLAT RATE
SITE CLEANOUT / ROUGH CLEAN
$397
UP TO FULL TRAILER • LIGHT TRASH, PALLETS, CARDBOARD, PACKAGING, SCRAPS
DEBRIS REMOVAL — MEDIUM
$475
DRYWALL, WOOD, TRASH, MIXED CONSTRUCTION DEBRIS • UP TO 1 TON INCLUDED
HEAVY DEMO / TILE / CONCRETE / ROOFING
$650
HEAVY MATERIAL • UP TO 2 TONS INCLUDED, OVERAGE AT COST WITH SCALE TICKET
MATERIAL DELIVERY / JOBSITE RUN
$175 FIRST LOAD, $95 ADD-ON SAME TRIP
LUMBER, FIXTURES, CABINETS FROM SUPPLIER TO JOBSITE • SAME DAY WHEN POSSIBLE
APPLIANCE / FURNITURE HAUL + DUMP
$225 SINGLE, $350 PAIR
HAUL AND DUMP FEE INCLUDED • FURNITURE, APPLIANCES, FIXTURES FROM RENO
PUNCH LIST / REPEAT CLIENT DISCOUNT
$125 PER RUN OR $500 FOR 5-PACK PREPAID
FINAL SMALL RUNS, FIXES, RETURN TRIPS • 5-PACK FOR REPEAT BUILDERS AND PMS
ALL PRICES ARE ALL-IN, DUMP FEES INCLUDED UP TO LISTED WEIGHT. OVERWEIGHT BILLED AT COST WITH SCALE TICKET. SAME DAY DISPATCH WHEN BOOKED BY NOON. COI AVAILABLE ON REQUEST.
📄
COI ON DEMAND
📸
PHOTO BEFORE / AFTER
🕒
SAME DAY DISPATCH